The Oregon ADU Design-Build Process: From First Site Walk to Final Inspection
Understand the steps to plan, permit, price, and build a custom ADU in Clackamas County with fewer expensive surprises.
An ADU goes through the same stages as a full-size house: feasibility, design, permits, construction, and inspection. Design-build means one company carries it through all of them. Here is what happens at each stage and what you decide along the way.
1. Site walk
We walk the property with you and look at access for equipment, slope, where the utilities are, and how close the building can sit to each property line. You leave with a realistic cost range and a list of anything that needs a closer look.
2. Feasibility check
Before any drawing, we confirm which jurisdiction covers the lot, the zoning, and the size and setback rules that apply. On septic, this is when the system's capacity gets checked. See Can I build an ADU on my property?
3. Design
Plans are drawn for your lot: floor plan, elevations, foundation, and framing. You choose the layout and the finish level. If the structure needs engineering, it happens here.
4. Permits
The plans go to the building department with the permit application. Depending on the lot, that can include plumbing, electrical, and mechanical permits, a septic review, and system development charges.
Oregon's 2026 Residential Specialty Code took effect on October 1, 2026, with a transition period into 2027. Plans submitted during the transition should confirm which edition the building department will review them under.
5. Fixed bid and contract
With plans and permit requirements known, the price is fixed in a line-item bid. You sign a construction contract that locks the design and the price.
6. Construction
- Site and foundation. Excavation, utility trenches, footings, and slab or crawlspace.
- Framing and roof. Walls, roof, windows, and exterior doors. The building becomes weather-tight.
- Rough-ins. Plumbing, electrical, and heating are run inside the walls, then inspected.
- Insulation and drywall.
- Finishes. Cabinets, flooring, tile, trim, paint, and fixtures.
Inspections happen at set points along the way. Work does not get covered up until the inspector has seen it.
7. Final inspection and handover
The building department does a final inspection and issues the certificate of occupancy. We walk through with you, take care of the punch list, and hand over the keys.
What makes it go smoothly
- Decide the use first. A rental, a home for a parent, and a guest space lead to different layouts.
- Make selections on schedule. Late choices on cabinets and fixtures are the most common cause of delay.
- Keep changes in the design phase. A change on paper costs little. The same change after framing costs a lot.
For how our own design phase works in detail, see how our design process works.
Common questions
What does design-build mean?
One company is responsible for both the plans and the construction. You are not hiring a designer, then bidding the plans out, then managing the gap between the two.
When do I know the final price?
Before construction starts. A fixed, line-item bid is prepared at the end of the design phase, when the plans, the site conditions, and your finish choices are all known.
When can someone move in?
After the final inspection is approved and the building department issues the certificate of occupancy. Until then the ADU is not a legal dwelling.
Sources
- Oregon Building Codes Division: adopted codes
- Clackamas County Zoning & Development Ordinance, Section 839 (Accessory Dwelling Units)
Reviewed November 2026. Rules change, and zoning, overlays, utilities, and site conditions decide what can be built on a specific lot. Confirm with your planning and building departments before you rely on this guide.
Keep reading
Related guides
How Our Design Process Works: From Site Walk to Permit-Ready Plans
What happens between the first site walk and a signed construction contract: the Design Agreement, the plans, your selections, the permit, and the fixed bid.
Read guide →What Does It Cost to Build an ADU in Clackamas County?
A practical ADU budget guide for Clackamas County. Learn what construction, utilities, permitting, sitework, and contingency may include.
Read guide →Can I Build an ADU on My Property in Clackamas County?
Compare ADU rules for unincorporated Clackamas County, Happy Valley, Oregon City, Estacada, Sandy, and Milwaukie before drawing plans.
Read guide →Before you build
Start with the actual property.
Send us the address, what you want to build, and anything you already know about the site. We'll tell you what applies and what the next step is.
Or email erich@fridaydesignbuild.com