What Does It Cost to Build an ADU in Clackamas County? | Friday Design Build

Home » Guides » Costs & Budgeting

Costs & Budgeting · Friday Field Guide

What Does It Cost to Build an ADU in Clackamas County?

A practical ADU budget guide for Clackamas County. Learn what construction, utilities, permitting, sitework, and contingency may include.

3 min read · Reviewed November 2026 · Friday Design Build

There is no honest single price for an ADU, because the building is only one part of the budget. Two ADUs with the same floor plan can land far apart once the site, the utilities, and the fees are added. This guide walks through each part so you know what a complete number has to cover.

The six parts of an ADU budget

  • The building. Foundation, framing, roof, siding, windows, insulation, drywall, cabinets, flooring, and fixtures. Size, layout, and finish level drive this part.
  • Site work. Clearing, grading, excavation, drainage, and a driveway or path. See our guide to ADU sitework costs.
  • Utilities. Sewer or septic, water, power, and sometimes gas. How far each one has to run matters as much as what it connects to.
  • Design, engineering, and permits. Plans, any structural engineering, and the building, electrical, plumbing, and mechanical permits.
  • System development charges. One-time fees charged when a new dwelling is added. They pay for roads, parks, sewer, and water capacity.
  • Contingency. Money set aside for what nobody can see until the ground is open.

A sample ADU estimate

Here is an illustrative estimate for a 760-square-foot, two-bedroom detached ADU on a flat lot already served by city sewer, with mid-range finishes. It is an example built from the six parts above, not a quote and not a past project. Your number depends on your lot and your selections.

Part of the budgetSample cost
The building (shell plus mid-range finishes)$139,000
Site work (clearing, grading, foundation prep, drainage)$22,000
Utilities (sewer, water, and power connections)$13,000
Design, engineering, and permits$17,000
System development charges$14,000
Contingency$9,000
Total$214,000

A comparable build in Clackamas County typically lands between $180,000 and $250,000. A sloped lot, a septic connection, a longer utility run, or higher-end finishes push toward the top of that band; a flat lot on sewer with simpler finishes sits nearer the bottom.

This is a planning example, not a bid. We give you a fixed, line-item price only after a site walk and the design phase, when the lot and your selections are known.

Why two same-size ADUs cost different amounts

The plan is the predictable part. These are the things that move the total:

  • Slope and soil. A flat lot with good soil needs a simple foundation. A slope can mean retaining walls, stepped footings, or engineered fill.
  • Sewer or septic. Tying into a nearby sewer line is usually the simpler case. On septic, the county has to confirm the system can serve a second dwelling, which can mean an upgrade or a new system.
  • Distance. Every foot of trench for sewer, water, and power costs money, and more if it crosses a driveway or mature landscaping.
  • Electrical capacity. An older main panel may need an upgrade before it can feed a second dwelling.
  • Finish level. Cabinets, counters, tile, and fixtures have the widest price range of anything in the building.

The fees that surprise people

System development charges are the line most homeowners have never heard of. They are set by the county, your city, and local service districts, so the amount depends on the address. Ask for the actual figures for your lot before you commit to construction, not an average.

Friday Design Build passes permit fees and system development charges through at cost and shows them as separate lines, so you can see exactly what the agencies charge.

Shell or turn-key

You can have the ADU built complete, or take a permitted, weather-tight shell and finish the interior yourself. A shell lowers the first check you write. Keep in mind that an ADU is not a legal dwelling until it passes final inspection, so the shell is the first phase of the project, not the end of it.

How to get a real number for your property

  1. Site walk. We look at access, slope, utilities, and setbacks, and give you a realistic range.
  2. Design phase. Plans are drawn, the zoning is confirmed, and you choose the finish level.
  3. Fixed bid. You get a line-item price before any construction contract is signed.

Our current starting prices are on the ADU page. Treat any starting price, ours included, as the low end for a simple site.

Common questions

Is a smaller ADU always cheaper per square foot?

No. A kitchen, a bathroom, and the utility connections cost about the same whether the ADU is 400 or 800 square feet. Spread over fewer square feet, those fixed costs push the price per square foot up, even though the total is lower.

Are permit fees and system development charges included in a builder's price?

It depends on the builder, so ask. Friday Design Build shows permit fees and system development charges as their own lines in the estimate and passes them through at cost.

When will I know the real number?

After design. A site walk gets you a realistic range. A fixed, line-item bid comes at the end of the design phase, once the plans, the site conditions, and your finish choices are known.

Sources

Reviewed November 2026. Rules change, and zoning, overlays, utilities, and site conditions decide what can be built on a specific lot. Confirm with your planning and building departments before you rely on this guide.

Keep reading

Related guides

All guides →

Before you build

Start with the actual property.

Send us the address, what you want to build, and anything you already know about the site. We'll tell you what applies and what the next step is.

Or email erich@fridaydesignbuild.com