Accessory Dwelling Units · Clackamas County, Oregon
ADU Builder in Clackamas County
Friday Design Build is a licensed design-build contractor based in Estacada. We check your zoning, draw the plans, pull the permits, and build your ADU under one roof, with a line-item estimate you can actually read.
- Oregon CCB# 258428
- 12 years in high-end residential
- Based in Estacada
- Line-item estimates
The short version
Building an ADU in Clackamas County, at a glance
An accessory dwelling unit (ADU) is a second, smaller home on the same lot as a single-family house. Clackamas County allows them on most residential lots inside urban growth boundaries, and since September 2024 on qualifying rural properties too.
- Maximum size
- 900 sq ftIn unincorporated Clackamas County, in most cases. Cities set their own limits.
- Rural lots
- 2+ acresRural residential zoning, outside urban growth boundaries and urban reserves.
- Plans and permits
- About 12 weeksDesign, drawings, and permit approval before construction starts.
- Starting price
- From $300/sq ftShell or turn-key. Most ADUs we build are 400 to 800 square feet.
How it works
From first call to final inspection
One company handles design, permitting, and construction, so nothing gets lost between an architect, the county, and a builder.
Site walk
We walk the property with you, look at access, utilities, septic, and setbacks, and talk through what you want to build. No cost.
Design Agreement
We produce the plans and manage the permit submittal. Plan on about 12 weeks. The plans are yours to keep.
Line-item estimate
You get a fixed-price Construction Contract with every cost itemized. Permit fees and SDCs pass through at cost.
Build
We run the job with a trusted bench of local trades and stay your single point of contact through final inspection.
Budget
What an ADU costs in Clackamas County
ADUs start at about $300 per square foot, shell or turn-key. Five things move the final number more than anything else:
- Size and layout. A 500 square foot one-bedroom and a 900 square foot two-bedroom are very different builds.
- Site work. Slope, access for equipment, and how far utilities have to run.
- Septic or sewer. Connecting to sewer, tying into an existing septic system, or installing a new one.
- Permits and SDCs. One-time county, city, and district fees that depend on your address. We pass them through at cost.
- Finish level. Cabinets, flooring, tile, fixtures, and exterior materials.
Every estimate is itemized, so you can see where the money goes and adjust scope before you sign.
ADU feasibility guide
Can you build an ADU on your property?
Most residential lots qualify. Inside a city or urban growth boundary, almost any lot with one single-family house can add one ADU. On rural residential land you need at least two acres. On farm and forest zoning, a standard ADU is not allowed.
- Inside a city
- Usually yesOne ADU per single-family house. The city sets size and design rules.
- Unincorporated, urban
- Usually yesOne ADU up to 900 square feet in most zones. Building permit only.
- Rural residential
- If 2+ acresZones RA-2, RRFF-5, FF-10, RR, and FU-10, outside urban reserves.
- Farm and forest
- NoNot allowed in EFU, AG/F, or TBR zones. Other options may exist.
Step by step
Eight feasibility checks
Work through these in order. The first three are deal-breakers. The rest shape cost and design.
-
Who has jurisdiction: a city or the county?
Your mailing address does not answer this. Plenty of properties with a city name in the address sit outside city limits, where Clackamas County's zoning code applies. Look your address up on the county's zoning map. Inside Estacada, Sandy, Gladstone, Milwaukie, West Linn, Happy Valley, Oregon City, Lake Oswego, Wilsonville, Canby, Tualatin, Gresham, or Troutdale, the city's code applies. Boring, Damascus, Eagle Creek, Beavercreek, Colton, Redland, Firwood, Clackamas, and Welches are unincorporated.
-
Does your zone allow an ADU?
In unincorporated Clackamas County, ADUs are allowed in single-family residential zones inside urban growth boundaries, in some designated unincorporated communities, and in these rural zones: RA-2, RRFF-5, FF-10, RR, and FU-10. RA-1 qualifies inside some unincorporated communities, including Redland and Colton. ADUs are not allowed in EFU, AG/F, or TBR zones.
-
Which rule set applies: urban or rural?
Inside an urban growth boundary or unincorporated community: one ADU per detached single-family home or manufactured home, with few rules beyond the size cap. Outside both: the lot must be at least two acres and outside any urban reserve, and the rural standards in the next checks apply.
-
What is already on the lot?
An ADU is accessory to a house, so there has to be a primary home. On rural lots there must be exactly one: no second dwelling, no guest house, and no RV used as a dwelling. The primary home also cannot be under a nuisance declaration. Once a rural ADU is approved, no further dwelling or guest house can be added.
-
Will it fit?
The county's cap is 900 square feet in most zones (500 in R-2.5). A rural ADU must sit within 100 feet of the main home, measured between the closest points of the two buildings, and meet the same setbacks as a primary dwelling in that zone. Cities set their own size, height, and setback rules.
-
Sewer, septic, and water
On public sewer, the question is connection and system development charges. On septic, the county has to confirm the system can handle another dwelling, which can mean an upgrade or a separate system. This is the check that most often changes the budget and where the ADU can sit, so we look at it first.
-
Fire protection and access
A rural lot must be served by a fire protection provider, and the driveway has to work for fire equipment and evacuation. The county accepts documentation from your fire district, submitted before the septic or building permit is approved.
-
Overlays and how you plan to use it
Floodplain, steep slopes, stream buffers, and historic districts can restrict where you build. Ask Planning whether any overlay touches your lot. Also decide the use up front: a rural ADU cannot be a short-term rental, and each city has its own rental rules.
By jurisdiction
ADU size limits where we build
Size is the rule that changes most from place to place. These are the limits we could confirm from each jurisdiction's own documents.
| Jurisdiction | Maximum ADU size | Worth knowing |
|---|---|---|
| Unincorporated Clackamas County (urban) | 900 sq ft in most zones; 500 sq ft in R-2.5 | One ADU per detached house. Most need only a building permit, with no land use review. |
| Unincorporated Clackamas County (rural) | 900 sq ft | Two-acre minimum. Within 100 feet of the house. No short-term rental. |
| Estacada | 900 sq ft; a full-basement suite can reach 1,200 sq ft | Allowed in R-1, R-2, R-3, and C-2. No minimum size and no owner-occupancy rule. |
| Oregon City | 800 sq ft or 60% of the main home's floor area | Exterior materials and window trim must match the main house. |
| West Linn | Up to 1,000 sq ft, also limited by the size of the main home | Siding, roof pitch, trim, windows, and eaves must match the main house. |
| Happy Valley | Must be smaller than the main home | Standards are in Land Development Code 16.44.050. |
| Sandy, Gladstone, Milwaukie, Lake Oswego, Wilsonville, Canby, Tualatin, Gresham, Troutdale | Set by each city's code | We confirm the current limit for your lot as part of the feasibility check. |
Sources: Clackamas County Zoning & Development Ordinance Section 839 and the county's rural ADU FAQ; the City of Estacada ADU fact sheet; Oregon City's ADU packet (revised January 2025); West Linn Community Development Code Chapter 34; the City of Happy Valley. Reviewed November 2026. Codes change and overlays can alter the answer for a specific lot, so confirm with the planning office before you rely on any of this.
Who to call
The offices that give the official answer
Clackamas County Planning & Zoning
Zoning, overlays, and whether your lot qualifies.
- 503-742-4500
- zoninginfo@clackamas.us
- 150 Beavercreek Road, Oregon City
Clackamas County Building Codes
Permit process and permit costs.
- 503-742-4240
- bldservice@clackamas.us
- Inside a city, start with that city's planning department instead
Or let us do it. Send us the address and we will look up the zoning, check the rules above, walk the site, and tell you plainly what is buildable. No cost.
Questions homeowners ask us
Clackamas County ADU FAQ
Can I build an ADU on my property in Clackamas County?
In most cases, yes. Inside urban growth boundaries and unincorporated communities, Clackamas County allows an ADU on lots zoned for a single-family home, with a size limit of 900 square feet in most cases. Since September 3, 2024, ADUs are also allowed on qualifying rural residential properties of two acres or more. Properties inside city limits follow that city's rules. Send us your address and we will check the zoning for you.
How big can an ADU be in Clackamas County?
In unincorporated Clackamas County the limit is 900 square feet in most zones, and 500 square feet in the R-2.5 zone. Rural ADUs are capped at 900 square feet. Cities set their own limits: Estacada allows 900 square feet, and Oregon City allows 800 square feet or 60 percent of the main home's floor area.
Can I build an ADU on rural property or acreage in Clackamas County?
Yes, if the property qualifies. The lot must be at least two acres, in a rural residential zone such as RA-2 or RRFF-5, outside any urban growth boundary and urban reserve, served by a fire protection district, and have only one existing single-family dwelling. The ADU must be within 100 feet of the main home, no larger than 900 square feet, and cannot be used as a short-term rental.
How do I find out if my property is in a city or in unincorporated Clackamas County?
Look the address up on Clackamas County's online zoning map, or call Planning and Zoning at 503-742-4500. Do not go by the mailing address. Many properties with a city name in the address are outside city limits, where the county's zoning code applies.
Which zones allow an ADU in unincorporated Clackamas County?
Single-family residential zones inside urban growth boundaries, some designated unincorporated communities, and the rural zones RA-2, RRFF-5, FF-10, RR, and FU-10. RA-1 qualifies inside some unincorporated communities, including Redland, Colton, and Mulino. ADUs are not allowed in EFU, AG/F, or TBR zones.
Do I need land use approval to build an ADU?
Usually not in unincorporated Clackamas County. The county says most ADUs need no land use approval, so you apply directly for a building permit. Properties with overlays or special circumstances can be different, and each city has its own process.
Can I build an ADU on farm or forest land?
No. Clackamas County does not allow ADUs in the EFU, AG/F, or TBR zones. Depending on the property, other options may exist, such as a detached studio or office built as an accessory building.
Can an RV or a tiny home on wheels be my ADU?
No. An ADU has to be a permitted, permanent dwelling. Recreational vehicles and tiny homes on wheels do not qualify. The county has a separate set of rules for using an RV as a second dwelling.
How much does it cost to build an ADU in Clackamas County?
ADUs from Friday Design Build start at about $300 per square foot, shell or turn-key, and most are 400 to 800 square feet. Size, site work, utility runs, septic, and finish level drive the final number. Permit fees and system development charges are passed through at cost with no markup, and every estimate is itemized line by line.
How long does it take to build an ADU?
Plan on about 12 weeks for design, plans, and permitting, then roughly four to six months of construction for a typical detached ADU. Site conditions, septic approval, and weather can move that schedule.
Do I need a permit to build an ADU in Clackamas County?
Yes. Every ADU needs a building permit, plus electrical, plumbing, and mechanical permits. Properties on septic also need a septic review. Friday Design Build prepares the plans and manages the permit submittal for you.
What are system development charges (SDCs) on an ADU?
System development charges are one-time fees that the county, city, or local service districts charge when a new dwelling is added, covering things like transportation, parks, sewer, and water. The amount depends on your address. We get the actual figures for your lot before you commit to construction and pass them through at cost.
Can I rent out my ADU?
Long-term rental is one of the most common reasons to build an ADU. Short-term rental is different: rural ADUs approved under the county's rural rules cannot be used as vacation rentals, and each city has its own short-term rental rules. Tell us your plan up front so the project is designed to fit the rules.
Can I build an ADU if my property is on septic or a well?
Often, yes. The ADU has to meet state requirements for water supply and wastewater. Depending on the capacity and condition of your existing septic system, the ADU may be able to connect to it, or the system may need an upgrade or a separate system. We sort this out early because it affects both cost and where the ADU can sit.
What kinds of ADUs does Friday Design Build build?
We build new, stick-built ADUs: detached backyard cottages, ADUs paired with a new garage or shop, and in-law units for family. Every one is designed for the lot rather than built from a prefab kit. If you want a garage or shop with the ADU, see our garage and shop builds.
How does the design-build process work?
Two simple agreements. First, a Design Agreement covers plans and permitting, and the plans are yours to keep. Second, a fixed-price Construction Contract with a line-item estimate covers the build. One company is responsible from the first sketch to final inspection.
What if my property does not qualify for an ADU?
There are often other routes, such as a detached studio or office built as an accessory building, or the county's separate rules for other second-dwelling options. We will tell you plainly what is and is not buildable before you spend money on plans.
Where we build
ADU construction across Clackamas County
We are based in Estacada and keep our work close to home. If your property is in or near one of these communities, we can usually walk it within the week.
- Estacada
- Sandy
- Boring
- Colton
- Damascus
- Clackamas
- Gladstone
- Milwaukie
- West Linn
- Beavercreek
- Eagle Creek
- Happy Valley
- Firwood
- Redland
- Oregon City
- Welches
- Lake Oswego
- Wilsonville
- Canby
- Tualatin
- Gresham
- Troutdale
Which rules apply to you? Inside the city limits of Estacada, Sandy, Gladstone, Milwaukie, West Linn, Happy Valley, Oregon City, Lake Oswego, Wilsonville, Canby, Tualatin, Gresham, and Troutdale, the city's own zoning code applies. Boring, Colton, Damascus, Clackamas, Beavercreek, Eagle Creek, Firwood, Redland, and Welches are unincorporated, so Clackamas County's zoning code applies there. Gresham and Troutdale are in Multnomah County, and most of Tualatin is in Washington County. We confirm which jurisdiction covers your lot before any design work starts.
Get a bid
Send us your address. We'll tell you what's buildable.
Tell us where the property is and what you have in mind. We'll check the zoning, schedule a site walk, and follow up with a real line-item estimate. No cost, no obligation.
Or email erich@fridaydesignbuild.com