Rural ADUs in Clackamas County: Six Questions Before You Draw Plans

Understand qualifying rural ADU parcels, two-acre rules, 900-square-foot limits, setbacks, septic requirements, and short-term-rental restrictions.

3 min read · Reviewed November 2026 · Friday Design Build

Clackamas County has allowed accessory dwelling units on rural residential land since September 3, 2024. The rules are stricter than they are in town, and a lot has to pass every one of them. Work through these six questions before you pay for plans.

1. Is the lot at least two acres in a qualifying zone?

The lot must be two acres or larger and zoned RA-2, RRFF-5, FF-10, RR, or FU-10. Farm and forest zones do not qualify. You can check your zone on the county zoning map.

2. Is it outside the urban growth boundary and any urban reserve?

The rural rules apply outside urban growth boundaries and outside urban reserves. Lots inside a designated unincorporated community, such as Redland or Colton, fall under different provisions, and those are generally simpler.

3. What is already on the lot?

There has to be exactly one single-family or manufactured home. The lot cannot have a second dwelling, a guest house, or an RV being used as a dwelling. The existing home also cannot be under a nuisance declaration. Once the ADU is approved, no additional dwelling or guest house can be added.

4. Is there fire protection and access?

The property has to be served by a fire protection provider, and the driveway has to work for fire equipment and evacuation. The county accepts documentation from your fire district, submitted before the septic or building permit is approved.

5. Can the septic and water handle a second home?

This is the question that most often changes the budget. The ADU has to meet state rules for water supply and wastewater. Depending on your existing septic system, the ADU may be able to connect to it, or you may need an upgrade or a separate system.

Oregon DEQ's updated onsite wastewater rules took effect on January 1, 2026. Have the system evaluated under the current rules before you design around it.

6. How do you plan to use it?

A rural ADU:

  • Can be no larger than 900 square feet.
  • Must sit within 100 feet of the main home, measured between the closest points of the two buildings.
  • Must meet the zone's setbacks for a primary dwelling.
  • Cannot be used as a short-term rental.

Housing for family and long-term rental are both allowed.

If your lot does not qualify

There are sometimes other routes, such as a detached studio or shop built as an accessory building. Our guide to garages, shops, and ADUs explains the difference. Send us the address and we will tell you plainly what the lot allows.

Common questions

Can I build an ADU on farm or forest land?

No. The rural ADU rules apply only to rural residential zones. ADUs are not allowed in the EFU, AG/F, or TBR zones.

Can an RV or a tiny home on wheels count as my rural ADU?

No. A rural ADU has to be a permitted, permanent dwelling. Clackamas County has a separate set of rules for using an RV as a second dwelling.

Can I use a rural ADU as a vacation rental?

No. A rural ADU cannot be used as a short-term rental. Long-term rental and family use are allowed.

Sources

Reviewed November 2026. Rules change, and zoning, overlays, utilities, and site conditions decide what can be built on a specific lot. Confirm with your planning and building departments before you rely on this guide.

Keep reading

Related guides

All guides →

Before you build

Start with the actual property.

Send us the address, what you want to build, and anything you already know about the site. We'll tell you what applies and what the next step is.

Or email erich@fridaydesignbuild.com